Info

urn"

rr7>£ 2 ABOVE- s-nz/f-jf '¿T/ZMZ tLofizse /av ««/«wo«* ~ry-/'£- Z-

Sffc-kLv^tSv^K -rrpe: / SCLOV "^■j^/Avi rot/zerf a.

BIZICJC /OOJi 7~rPjE 3

2.20 Elevation as a guide to external finishes not easily indicated in detail by other means 42

2.21 Elevation as a schedule for pre-cast panels. Note the difference in method from that used in 2.19. H ere, with a limited range of panel types, and with each panel component drawing giving full information about it, the elevation itself forms an adequate schedule

Was this article helpful?

0 0

Post a comment